Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

March 14, 2022

April 13, 2022

October 14, 2022

W Cedar St

Paving, Site Work

No Information to Display

$1,269,893.00

Public - City

img_map_placeholder

W Cedar St, Platteville, WI

21

21

6

Subscribe to View Full Documents

The Project consists of replacing utilities and completely reconstructing Cedar Street from Hickory Street to Chestnut Street and also replacing water main and sanitary sewer from Chestnut Street to Fourth Street. Bids shall be on a unit price basis, with additive alternate bid items as indicated in the Bid Form. Bidding Documents may also be examined at the office of the City of Platteville, at 75 N. Bonson Street, Platteville, Wisconsin 53818, on Mondays through Fridays between the hours of 8:00 a.m. and 4:30 p.m. CST. Partial sets of Bidding Documents will not be available from the Issuing Office. Neither Owner nor Engineer will be responsible for full or partial sets of Bidding Documents, including Addenda if any, obtained from sources other than the Issuing Office. Consideration of Bids: No proposal will be accepted unless accompanied by a certified check or bid bond equal to at least five percent (5%) of the amount bid, payable to the OWNER as a guarantee that, if the bid is accepted, the Bidder will execute and file the proper contract and bond within 15 days after the award of the contract. The certified check or bid bond will be returned to the Bidder as soon as the contract is signed. If after 15 days the Bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. BIDDER is required to deliver the original certified check or bid bond within 72 hours of bid opening to Delta 3 Engineering, Inc., Attn: Katlyn Churchill, 875 S. Chestnut Street, Platteville, Wisconsin 53818. Bids may not be withdrawn within 90 days after the date of the bid opening. The OWNER reserves the right to increase or decrease the quantity of any item or portion of the work, or to omit portions of the work, as may be deemed necessary by the OWNER, and the same shall in no way affect or make void the contract, except those additions to, or deductions from, the contract price will be appropriately made. The OWNER reserves the right to waive any informalities, or to reject any or all bids, or any part of a bid, and to award the Contract to the Bidder, who in the judgment of the OWNER, will best serve the interest of the OWNER. A pre-bid conference will not be conducted. Additional Conditions. The letting of the work described herein is subject to the provisions of Sections 62.15 and 66.0901.

23 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects