Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

February 11, 2022

March 14, 2022

August 22, 2022

1 Vision Blvd

Renovation

No Information to Display

$499,850.00

Public - City

img_map_placeholder

1 Vision Blvd, Somers, CT

Subscribe to View Full Documents

The Town of Somers will be accepting proposals from qualified individuals or firms to provide a turnkey replacement of two existing hot water heating boilers, pumps, water heaters and associated appurtenances at the Somers High School in Somers, CT. Late proposals will not be considered. A. Provide shop drawing submittals of proposed boilers, water heaters, pumps, valves and controls and other items indicated in the specifications for engineer’s and Owner’s acceptance. B. Disconnect existing electric power and controls and make safe for unit removal. Prepare electrical for new replacement boilers, pumps and controls. C. Disconnect and remove indicated heating hot water piping and fuel oil piping inside boiler room at locations indicated, preparing pipe ends for extension to new boilers and equipment. Provide isolation valves for main HWS&R lines inside boiler room. D. Remove existing oil fired heating boilers, pumps and water heaters. There is an exterior areaway with doors into the boiler room from outside. E. Remove the main HW heating distribution pumps, heat exchanger and other trim and accessories indicated. Remove portions of the domestic HW piping as indicated. F. Clean the boiler room. Prepare the space, housekeeping pads, and other areas to accept the new equipment and work. G. Deliver, rig and install new heating boilers, water heaters, pumps, hydronic accessories and equipment. H. Provide new heating and domestic hot water piping, valves, trim, insulation and accessories as indicated. I. Remove existing boiler breechings and replace with new to the existing masonry chimney. Provide new boiler breechings for the new summer boiler. J. Remove fuel oil piping to existing water heaters. K. Provide new boiler controller and interface to EMCS controls as indicated. L. Reconnect power to new boilers, water heaters, VFDs and pumps and reconfigure power to new control panels, water heaters and other items indicated. M. Start up system, test and place into operation. Coordinate startup with Owner’s EMCS Contractor and Town of Somers maintenance personnel. N. Make provisions to protect work area, access route, the site and building conditions from damage and repair/restore to original condition if damaged during work. Provide suitable floor coverings in work and traffic areas. O. Refer to drawings, specifications and drawing notes for additional scope of work items

15 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.