Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 27, 2022

March 28, 2022

September 2, 2022

Multiple Locations

Paving, Site Work

No Information to Display

$1,138,034.00

Public - City

img_map_placeholder

Multiple Locations, Onalaska, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

7

Subscribe to View Full Documents

Utility Project will install 2,250' of water main, 1,215' of sanitary sewer, 790' of sanitary force main, and 1,100'of storm sewer utilities. Project will also include asphalt pavement, concrete curb & gutter and aprons, restoration, and traffic control. Water Main 2,250 L.F. of 6'' DIP Water Main 6 ea. Hydrants 10 ea. Gate Valves 1'' Corporation Valves, Curb Stops & Boxes, and Copper Water Services Sanitary Sewer 1,215 L.F. of 8" SDR 35 330 L.F. of 12" SDR 35 7 ea. 48" Dia. Sanitary Manhole 790 L.F. of 6" DIP Force Main 4" SDR 35 Laterals Storm Sewer 200 L.F. of 12" CL V RCP 200 L.F. of 18" CL V RCP 650 L.F. of 36" CL IV RCP 6 ea. 2'x3' Inlets 3 ea. 48'' Dia. Storm Manhole 2 ea. High Capacity Inlets Pavement, Crushed Aggregate, & Misc. 2,000 Ton 3'' Asphalt Pavement 5,800 Ton Crushed Aggregate Base Course 4,900 L.F. Curb & Gutter 9,000 S.F. Concrete Sidewalk/Drive Apron 825 C.Y. Black Dirt 4,250 S.Y. Seed, Fertilizer, & Mulch Removals/ Excavation/Traffic Control **Plus Additional Misc. Appurtenances 2022 Utility project will reconstruct 11th Avenue North (Main Street to Well Street), Monroe Street (11th Ave N to cul de sac), Pierce Street (11th Ave N to Sand Lake Road), and work within a utility easement at Center 90 (11th Ave N to Sand Lake Road). The Onalaska branch of the United States Post Office, St. Patrick Elementary School, St. Patrick Catholic Church, and Center 90 are all located within or along the 2022 Utility project construction boundary. Construction activities along 11th Avenue North in front of St. Patrick Elementary School, St. Patrick Catholic Church, and the United States Post Office will be limited to a construction timeframe from May 31st to August 26th, 2022. The existing water main, gravity sanitary sewer, and sanitary sewer force main are located on the eastern half of 11th Avenue North, with the two sanitary sewer utilities located only a few horizontal feet apart. In order to maintain proper utility separation distances during construction it is anticipated that the Contractor would have to install the new water main on the western half of 11th Avenue North, including water service reconnection, prior to replacement of either sanitary sewer utility

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects