Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 24, 2023

November 23, 2023

No Information to Display

525 N Main St

Renovation

No Information to Display

$400,000.00

Public - County

img_map_placeholder

525 N Main St, Wichita, KS

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Sedgwick County, Kansas (hereinafter referred to as "county") is seeking a firm or firms to provide chiller rebuild. The following objectives have been identified for this contract: 1. Acquire HVAC Services meeting the parameters, conditions and mandatory requirements presented in the document. 2. Establish contract pricing with the vendor that has the best proven "track-record" in performance, service and customer satisfaction. 3. Acquire HVAC Services with the most advantageous overall cost to the county Items listed in this section are requirements to completion of services under this contract. Contractor shall furnish labor, parts, material, and equipment necessary to perform the following rebuild of Chiller #1 using the factory suggested rebuild guidelines. This need for rebuild is based on two (2) oil analysis samples that came back with abnormal results on the chiller. Chiller #1 information: Unit Model # YT H3 A3 C3-CN J Compressor Model # YTDJ-CB The rebuild of Chiller #1 shall include but is not limited to the below items and shall use only York factory authorized parts (OEM). 1. Shaft seal 2. PRV shaft 3. Bearings 4. O-rings 5. Clean oil sump 6. Oil 7. Oil filter 8. Gaskets 9. Suction gaskets 10. Oil sump sight glasses 11. Low speed (LS) thrust cover 12. High speed (HS) thrust cover 13. Ring seal balance port 14. Ring eye seal 15. Motor rebuild performed by factory authorized rebuild shop 16. Oil sample for baseline after rebuild completed- sent to Johnson Controls Factory Analysis Team 17. Vibration analysis for baseline after rebuild completed- sent to Johnson Controls Factory Analysis Team Main Courthouse Chiller Rebuild - Rebuild one Chiller at the Main Courthouse 525 N. Main Street Wichita, KS 67203 **Inquiries regarding Bid Documents, Bid/Selection process or any requests for information about this specific project shall be directed in writing only to: Lee Barrier, Purchasing Agent 525 North Main Street, Suite 823 Wichita, KS 67203 Telephone: (316) 660-7258 Fax: (316) 383-7055 E-mail: Lee.Barrier@sedgwick.gov Items listed in this section are requirements to completion of services under this contract. Contractor shall furnish labor, parts, material, and equipment necessary to perform the following rebuild of Chiller #1 using the factory suggested rebuild guidelines. This need for rebuild is based on two (2) oil analysis samples that came back with abnormal results on the chiller

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.