Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 6, 2023

March 31, 2024

April 30, 2026

345 E Shore Pkwy

Renovation

No Information to Display

$57,577.00

Public - City

img_map_placeholder

345 E Shore Pkwy, New Haven, CT

Subscribe to View Full Documents

The Greater New Haven Water Pollution Control Authority (GNHWPCA) funds and maintains a Capital Improvement Program (CIP) to ensure that its sewer systems are reliable, safe and efficient while at the same time contributes to protect the environment. Funding for the CIP is provided through the following sources: GNHWPCAs annual operating budget, revenue bonds, grant reimbursements and grant/loan programs provided by the Connecticut Department of Environmental Projection (DEP) along with other incidental projects required by state agencies such as the Connecticut Department of Transportation (DOT.) In this section, you will find detailed information on major construction projects currently underway in the GNHWPCA Service Area. The information will provide project purpose and description as well as GNHWPCA contacts. (project descriptions from intranet projects page community description ) The Project contemplated consists of providing all materials, equipment, labor, and supervision for the construction of a new process air compressor facility including, site civil work, relocation of underground utilities, abandonment of existing utilities, installing micropiles, construction of a new process air compressor building with an electrical room, installation of 6 process air compressor units, installation of process air piping and controls, demolition of existing process air piping and controls, construction of walk ways and sidewalks, repair to existing building masonry, repair to aeration basin construction joints, installation of site drainage, and paving of a new road. The process air compressor manufacturer and scope of supply have been preselected. Bidders will include the cost of the preselected equipment in their bid as shown on the Bid Form. The project duration is 750 calendar days. Each Bid must be submitted on the prescribed Bid Form and a certified check or bid bond in the amount of ten percent (10 %) of the total bid amount must accompany the bid. Said checks or bid bonds will be returned to the unsuccessful bidders upon Award of the Contract to the selected firm and execution of the Agreement. The Greater New Haven Water Pollution Control Authority reserves the right to alter quantities and to accept or reject any or all bids or any portion of any bids, for any or no reason, including unavailability of appropriated funds as it may deem to be in its best interests.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects