Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 13, 2022

March 14, 2022

October 31, 2023

Multiple Locations

Site Work

No Information to Display

$45,961,700.00

Public - County

img_map_placeholder

Multiple Locations, Carrington, ND

Subscribe to View Full Documents

Red River Valley Water Supply Project, Transmission Pipeline East, Carrington to Bordulac, Foster County, ND, Task Order 5532, Contract 5B. At said place and time, and promptly thereafter, all Bids that have been duly received will be publicly opened and read aloud. The proposed Work is generally described as follows: Construction of approximately 7 to 9 miles of 72-inch diameter steel water pipeline, including one 96-inch diameter trenchless crossing under the Canadian Pacific Railway. All other crossings will be by cut-and-cover methods with traffic control. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. Parallel fiber optic conduit and an impressed current pipeline corrosion protection system, including rectifier station, are included in the Work along with all other work specified or shown on the Drawings. The contact person for administrative questions with Garrison Diversion is Ms. Stacey Gussiaas at 701-652-3194 or email at staceyg@gdcd.org. For technical bidding document interpretations and clarifications, the contact person is Mr. Kip Kovar, District Engineer, at 701-652-3194 or kipk@ gdcd.org. The Successful Bidder will be required to furnish a construction performance bond and a construction payment bond as security for the faithful performance and the payment of all bills and obligations arising from the performance of the Contract. The Owner reserves the right to reject any and all bids and rebid the project until a satisfactory bid is received Estimated Range $45,000,000-$55,000,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

47 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.