Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2024

December 2, 2024

February 25, 2026

Buchanan St

Site Work

No Information to Display

$24,000,000.00

Public - City

img_map_placeholder

Buchanan St, San Francisco, CA

192

27

49

5

Subscribe to View Full Documents

The project is a complete renovation of the existing park and will install new program elements across all five blocks, including: two sports courts; two children s' play areas; an exercise area; a stage with decking; two lawns; two picnic and BBQ areas; two storage containers; utility connections for three future park activation kiosks; seating and picnic areas; decorative and permeable concrete pathways; fencing and gates; custom decorative metal elements; foundations for future art elements; concrete walls; lighting; planting; and irrigation. Work also includes: green infrastructure such as planted treatment areas, detention basins, and associated conveyance for storm water capture; structural rehabilitation of approximately 900 linear feet of pre-1906 brick sewer main via cured in place lining (CIPL); and installation of new manholes, sewer laterals, and other sewer improvements. Contract provisions emphasize workforce development and minimizing the impacts of construction on adjacent neighbours. Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with Administrative Code Chapter 12P, Minimum Compensation Ordinance. Bidder, by submitting the attached Bid Form, hereby acknowledges that Bidder has read the San Francisco Charter section A7.204, San Francisco Administrative Code section 6.22(e), and California Labour Code section 1770 et. seq. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award. Class "A" license is required at time of award. The SBE Participation Goal is 15%, MBE Goal is 10%, WBE Goal is 5%. For details

68 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects