Publicly Funded
Privately Funded
Bidding Soon
Documents Available
Addenda Available
Post-Bid
Post-Bid
Saving Project...
Full details on over 250,000 Projects including 2000 updated daily available to subscribers
October 2, 2024
December 2, 2024
February 25, 2026
Buchanan St
Site Work
No Information to Display
$24,000,000.00
Public - City
Buchanan St, San Francisco, CA
The project is a complete renovation of the existing park and will install new program elements across all five blocks, including: two sports courts; two children s' play areas; an exercise area; a stage with decking; two lawns; two picnic and BBQ areas; two storage containers; utility connections for three future park activation kiosks; seating and picnic areas; decorative and permeable concrete pathways; fencing and gates; custom decorative metal elements; foundations for future art elements; concrete walls; lighting; planting; and irrigation. Work also includes: green infrastructure such as planted treatment areas, detention basins, and associated conveyance for storm water capture; structural rehabilitation of approximately 900 linear feet of pre-1906 brick sewer main via cured in place lining (CIPL); and installation of new manholes, sewer laterals, and other sewer improvements. Contract provisions emphasize workforce development and minimizing the impacts of construction on adjacent neighbours. Minimum wage rates for this project must comply with the current General Prevailing Wage as determined by the State Department of Industrial Relations. Minimum wage rates other than applicable to General Prevailing Wage must comply with Administrative Code Chapter 12P, Minimum Compensation Ordinance. Bidder, by submitting the attached Bid Form, hereby acknowledges that Bidder has read the San Francisco Charter section A7.204, San Francisco Administrative Code section 6.22(e), and California Labour Code section 1770 et. seq. A corporate surety bond or certified check for ten percent (10%) of the amount bid must accompany each bid. Administrative Code Section 6.22(a) requires all construction greater than $25,000 to include performance and payment bonds for 100% of the contract award. Class "A" license is required at time of award. The SBE Participation Goal is 15%, MBE Goal is 10%, WBE Goal is 5%. For details
Trades
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Starting At
- All Starter Product functionality
- One license and one market (additional available after purchase)
- Full access to bidding and planning projects' details, documents and contacts
- Comprehensive planholders list coverage on bidding projects
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Related Projects
San Francisco, CA
Bid Date: Sep 10 2024
San Francisco, CA
Bid Date: Oct 10 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 19 2024
San Francisco, CA
Bid Date: Sep 17 2024
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
--
San Francisco, CA
Bid Date: Oct 30 2024
San Francisco, CA
--
San Francisco, CA
Bid Date: Sep 23 2024
San Francisco, CA
Bid Date: Sep 24 2024
San Francisco, CA
Bid Date: Sep 26 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
You're one step away from industry‑leading commercial construction data.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
