Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 5, 2025

August 21, 2023

November 13, 2024

820 W Lake Elbert Dr NE

Paving, Site Work

No Information to Display

$9,839,026.00

Public - City

img_map_placeholder

820 W Lake Elbert Dr NE, Winter Haven, FL

Subscribe to View Full Documents

**As of August 18, 2023, the project was awarded to Cathcart Construction Company, with an awarded amount of $9,839,026.50.** City of Winter Haven is seeking bids for a trail project around Lake Elbert. The project limits are approximately 1.8 miles. The project consists of the following: Removal of old utility and stormwater infrastructure; installation of new water/sewer & stormwater & fiber conduit; traffic calming; intersection improvements; a 6-8 foot wide trail along Lake Elbert; landscaping/tree installation/irrigation; rain gardens; small trailhead at Polk State College with passive park improvements; road resurfacing; sidewalk connections. Questions concerning this bid must be submitted on or before 2:00 p.m., June 6, 2023, to Andy Palmer at apalmer@mywinterhaven.com . Questions received after this time may not be answered Project Description, Notes to Bidders, Information, Alternatives 2-3 Descriptions & Progress Schedule The Lake Elbert Trail Project will include the construction of an approximate 1.8 mile 6-8 ft wide asphalt trail on the lake side of Lake Elbert; major water/sewer main and line removal and new installation; drainage improvements throughout the corridor; landscaping/irrigation improvements; development of a passive trailhead at the Lake Elbert Boat Ramp and milling and resurfacing. The southeastern and southwestern sides will connect into an existing trail along SR 542 / Dundee Road The project must achieve substantial completion within 420 consecutive Calendar Days from the receipt of the Notice to Proceed. The project must then have all punch list items completed within 30 Calendar Days after substantial completion has been achieved.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects