Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 27, 2021

November 26, 2021

January 30, 2023

To Be Determined

New Construction, Site Work

No Information to Display

$4,775,000.00

Public - City

img_map_placeholder

To Be Determined, Bellevue, NE

Subscribe to View Full Documents

1. Furnish and install one (1) factory built, factory delivered, Control Building with all necessary electrical equipment, conduit, wiring, lighting, instrumentation and control equipment, heating and ventilation system as shown and specified within the Contract Documents. 2. The Control Building shall be complete when delivered and will require Contractor lifting, placement and anchoring on the concrete structure in the manner prescribed by the manufacturer and at the proper stage of construction. a. The installation of the Electrical/Control building shall require the Contractor to run and terminate the power cabling and instrumentation and control wiring into a termination junction box mounted on the exterior of the building. b. The power conduit and wiring from the utility meter to the service entrance main circuit breaker shall be provided by the Contractor. The Manufacturer shall provide a sleeve and seal in the building wall for the Contractor to route the conduit and wiring from the utility meter to the main circuit breaker. c. The power and control conduits and wiring from the automatic transfer switch shall be provided by the Contractor. The Manufacturer shall provide a sleeves and seal in the building wall for the Contractor to route the conduit and wiring from the generator to the automatic transfer switch.

20 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.