Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 21, 2023

October 23, 2023

No Information to Display

To Be Determined

Renovation, Site Work

No Information to Display

$2,000,000.00

Public - City

img_map_placeholder

To Be Determined, Marshallville, GA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work to be done shall consist of furnishing materials and constructing the project titled Water Treatment Plant Rehabilitation. The major items of construction include, wet well, high service vertical turbine pumps, new chlorine feed building (lime, phosphate, chlorine and fluoride), connecting yard piping and all work as shown on the construction drawings. The work is considered an upgrade to the existing operations of the water treatment process. All bid forms must be accompanied by a Bid Bond In an amount not less than ten percent (10%) ot the base bid.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.