Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

January 29, 2024

April 28, 2025

Roosevelt Blvd

Paving, Site Work

No Information to Display

$5,000,000.00

Public - State/Provincial

img_map_placeholder

Roosevelt Blvd, Philadelphia, PA

Subscribe to View Full Documents

The Project Will Consist of Sidewalk Improvements and Site Work Related to Eight Bus Station Plazas Located at Four Intersections. The Proposed Work Will Include: Concrete Bus Station Plazas, Sidewalks, Ada Ramps, Curbs, Pedestrian Scale Lighting, Enhanced Seating, and Other Miscellaneous Construction, as Indicated on the Approved Drawings Included in the Bid Package for State Route 6001 (Roosevelt Boulevard), Section Bdb in Philadelphia County, City of Philadelphia From Approximately South of Rising Sun Avenue at Segment 0180 Offset 0827 to North of Pratt Street at Segment 0220 Offset 0115 and South of Rising Sun Avenue (Sr 1001) at Segment 0181 Offset 0821 to North of Pratt Street at Segment 0221 Offset 0146. Project Cost Range: $2,500,000.00 - $4,999,999.99 Federal Project Status: PENNDOT Oversight Non-NHS Structure Work: 0.00% Pre-bid Meeting: None Wage Rates: Yes Prequalification Requirement: Yes State Type of Work: Transportation Alternative Responses to questions on this page are for informational and clarification purposes. Official changes to the proposal will be made via an Addendum. The deadline for submitting questions is 72 hours before the let date and time. For Emergency projects, the deadline is reduced to 19 hours before the let date and time. PennDOT - Blvd Ped Safety and Direct Bus(L)

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects