Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 10, 2021

September 25, 2023

April 30, 2024

Multiple Locations

Addition, Demolition, New Construction, Site Work

No Information to Display

$23,400,000.00

Public - City

img_map_placeholder

Multiple Locations, Bloomfield, CT

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

As of August 18, 2023, construction has not started. Construction is likely to start at the end of September 2023. No trades have been awarded. *The closed solicitation has been included below for reference: TOWN OF BLOOMFIELD REQUEST FOR PROPOSALS #1107 CONSTRUCTION MANAGEMENT SERVICES FOR BLOOMFIELD PUBLIC LIBRARY FACILITIES The Town of Bloomfield is soliciting proposals from qualified Construction Managers at Risk for the purpose of construction management services for a new Prosser Library and addition and renovation of McMahon Wintonbury Library. All Construction Manager firms submitting proposals must be pre-qualified as a Construction Manager at Risk (Group B) as defined in the CT DAS Contractor Classification List. Submittal requirements may be found on the Town's website, www.bloomfieldct.gov. All responses must be received by 1:00 PM on September 10, 2021 to be considered. Approval of funding in the amount of $29,255,000 for this project is scheduled for referendum in November 2021. Estimated construction budget is approximately $23.4 million. The goal of the Town is to a) demolish the existing 20,200 sq. ft. Prosser Library, and replacing it with a new facility of approximately 28,000 SF on the same parcel, housing the same occupants, plus new parking on the adjoining (former lumber yard) property with a connecting bridge/walkway over Wash Brook, and b) renovate the existing 6,023 sq.ft. P. Faith McMahon Wintonbury Library along with a new addition of approximately 2,895 sq. ft. Schematic Design Phase 11/5/21-3/1/22 Design Development Phase 3/1/22-6/1/22 Construction Documents Phase 6/1/22-9/15/22 Bidding Phase 9/15/22-10/31/22 Construction 11/1/22-4/30/24 Construction Manager Services will commence after the November 2021 referendum subject to its approval. The selected Construction Manager shall provide performance and payment bond letter from the surety in the amount of 100% of the contract price.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.