Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 21, 2021

December 20, 2021

September 15, 2024

811 W 42nd St

New Construction, Renovation, Site Work

No Information to Display

$71,553,713.00

Public - City

img_map_placeholder

811 W 42nd St, Odessa, TX

Subscribe to View Full Documents

**Project was awarded to Garney Companies, Inc. in the amount of $71,553,712.64 https://www.tdlr.texas.gov/TABS/Search/Project/TABS2022008028 Project Name: Water Treatment Plant Rehabilitation and Misc Upgrades Project Number: TABS2022008028 Facility Name: City of Odessa Water Treatment Plant Location Address: 851 W 42nd ST Odessa, TX 79764 Location County: Ector Start Date: 1/28/2022 Completion Date: 12/31/2024 Estimated Cost: $84,000,000 Type of Work: Renovation/Alteration Type of Funds: This project involves public funds, public land, or is a Federally funded roadway project. Scope of Work: Rehabilitation and upgrades to the City of Odessa Water Treatment Plant Square Footage: 766,656 ft 2 _____________________________________________________________________________ The project includes multiple rehabilitation efforts and upgrades to various process mechanical, building mechanical, electrical, supervisory control and data acquisition (SCADA), instrumentation and control, civil, structural, and architectural components at the City of Odessa Water Treatment Plant (WTP). The project also includes SCADA upgrades at other City-owned remote sites including the City of Odessa Bob Derrington Water Reclamation Plant (WRP), remote sites associated with WTP and WRP, Police Department and City Hall. Major work components include but are not limited to demolition of the existing Plant 1 flocculation and sedimentation basin, the City's caustic soda building, and other structures. New construction includes a chlorine room extension at the North Chemical Building, a new flocculation and sedimentation train, a new South Chemical Building, a new hydraulic relief line from the filters to Clearwell No. 1, and a new Electrical Building. Upgrades include rehabilitation of the plant filters, filter building mechanical and structural rehabilitation, replacement of pumps and electrical equipment at various miscellaneous pump stations located within the plant grounds, replacement of mechanical and electrical equipment at the Golder Pump Station, upgrades to the Administration Building control room, break room, restrooms, and ventilation system, and site grading and restoration (including new and repaved chemical delivery roadways).

210 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.