Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 19, 2021

April 1, 2022

No Information to Display

Edwards Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Edwards Rd, Johnstown, OH

Subscribe to View Full Documents

As of 9/22/2021 Edwards Road; bid came in $65,000 over, overage is on the township portion of the road, Trustees say the extra money is not available; cannot split up job because it was put in as a joint project. Hoping to bid the project again in February for spring work, hoping for more competitive bidding 1) Township Line to 117' west of bridge: Resurface with 1-1/2" of ODOT Item 441 Asphalt Surface Course, Type 1 (448), PG64-22. 2) 117' west of bridge to 117' east of bridge. Excluding bridge: Preform ODOT Item 253 Pavement Repair both west and east of bridge. Provide butt joints at the bridge per ODOT Standard Drawing BP-3.1. Pavement Repair shall include the following minimum pavement buildup: 6" of ODOT Item 304 Aggregate Base. 5" of ODOT Item 301 Asphalt Concrete Base, 1-3/4" of ODOT Item 441 Asphalt Concrete Intermediate Course, Type 2 (448), PG64-22; and 1-1/2" of ODOT Item 441 Asphalt Concrete Surface Course, Type 1 (448), PG64-22. 3) Bridge MON-T059A-0045 over Racoon Creek: Preform ODOT Item 202 Wearing Course Removed to a depth of 5-1/2". Resurface with 1-1/2" of ODOT Item 441 Asphalt Concrete Surface Course, Type 1 (448), PG64-22. 2. Village of Johnstown a. Limits: 117' east of Bridge MON-T059A-0045 to North Oregon Street. b. Length: 0.64 miles (3,388') 19.0' average surface width c. Scope: Milling and resurfacing approximately 7,190 square yards of pavement. 3. The estimated construction cost for this project is $402,000 E. Construction Contract: Bids will be received for the following Work: 1. General Contract (all trades).

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects