Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 13, 2021

September 27, 2021

October 20, 2021

2 Winfield Rd

Demolition, Site Work

No Information to Display

No Information to Display

Public - County

img_map_placeholder

2 Winfield Rd, Winfield, IL

Subscribe to View Full Documents

Project Name: Truck Shed Demolition and Drainage Improvements at St. James Farm Forest Preserve Project Number: Project #Z-771-012A Project overview: Demolition of a truck shed and its foundation as well as an concrete slab adjacent to it and 2 nearby concrete slabs. The project will also include the replacement of approximately 840 LF of storm sewer and the installation of 2 drainage structures. All bids must be received prior to the date and time shown above. No late bids will be accepted. Consideration of contract award will likely be made on Tuesday, September 7, 2021. Also, the Contractor shall abide by the "Employment of Illinois Workers on Public Works Act" (30 ILCS 570, sec 1-7). Minority business firms are encouraged to submit bids on the project and successful contract bidders are encouraged to utilize minority businesses as subcontractors for supplies, equipment, services and construction. The Forest Preserve Commission reserves the right to reject any or all bids and to waive technicalities. The work to be done for this project, shown on the Drawings entitled, "TRUCK SHED DEMOLITION AND DRAINAGE IMPROVEMENTS AT ST. JAMES FARM FOREST PRESERVE," prepared by the Forest Preserve District of DuPage County dated July 26, 2021, consists of the demolition of a truck shed and its foundation as well as an concrete slab adjacent to it and 2 nearby concrete slabs. The project will also include the replacement of approximately 840 LF of storm sewer and the installation of 2 drainage structures.

16 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects