Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 16, 2025

January 15, 2024

August 20, 2027

Multiple Locations

Site Work

No Information to Display

$52,190,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Woodbridge, NJ

Subscribe to View Full Documents

Proposals are invited for Contract No. T100.581, which involves replacement of Piers 15 and 18, painting of existing steelwork at joint areas, and joint replacements from approximately Milepost W115.25 to W115.45 in the Borough of Carlstadt and Ridgefield, Bergen County, New Jersey and repairs to Pier E17 at Structure No. N2.01 in the City of Bayonne, Hudson County, New Jersey. The work to be performed under this Contract at Structure No. W115.36 involves replacement of waterway Piers 15 and 18 in their entirety with the exception of existing pile foundations to remain, including temporary trestles, temporary cofferdams, temporary foundations and support towers, structural jacking, new girder bearings, painting of existing weathering steel at joint locations, and various deck joint reconstruction and replacements. The work includes U.S. Coast Guard and utility company coordination, and all other work required in the successful prosecution of the Project. The work to be performed under this Contract involves Structure No. N2.01 Pier E17 repairs including pier jacketing and stone masonry rehabilitation. The work shall include the necessary traffic control, U.S. Coast Guard coordination, other agency coordination, and all other work required in the successful prosecution of the Project. All work under the Contract shall be performed and completed on or before July 30, 2027

31 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects