Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 12, 2021

August 11, 2021

No Information to Display

Cordia Hollow Rd

Site Work

No Information to Display

$98,980.00

Public - County

img_map_placeholder

Cordia Hollow Rd, Richwoods, MO

Subscribe to View Full Documents

The proposed work includes: Replacement of the existing crossing with a reinforced concrete 14 ft wide by 8 ft tall box culvert with aggregate roadwork and earthwork in compliance with construction plans. The project is located on Cordia Hollow Road in Section 1, Township 39N, Range 1E in Washington County, MO over Pinery Creek. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the United States Department of Labor (Federal Wage Rate), or by the Missouri Department of Labor and Industrial Relations (State Wage Rate), whichever is higher. The Washington County Commission hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. Contractors and sub-contractors who sign a contract to work on pub- lic works projects shall provide a 10- Hour OSHA construction safety pro- gram, or similar program approved by the Department of Labor and In- dustrial Relations, to be completed by their on-site employees within sixty (60) days of beginning work on the construction project. A certified cashier's check or a bid bond in the amount of 5% shall be submitted with each proposal. The Washington County Commission reserves the right to reject any or all bids. The project will be awarded to the lowest, responsive, responsible bidder. No 2nd tier subcontracting will be allowed on this project.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects