Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 16, 2021

August 16, 2021

November 29, 2021

S Seneca St & W Orange St

Site Work

No Information to Display

$50,266.00

Public - City

img_map_placeholder

S Seneca St & W Orange St, Shippensburg, PA

Subscribe to View Full Documents

The Project, of which the Work under the Contract Documents is a part, is generally described as follows: the Construction of a new stormwater inlet box structure to replace an existing structure including all associated work as shown in the plans and specifications.. Bids will be received for a single prime Contract. Bids shall be on a unit price basis. Bid security in the form a Certified Check or Bid Bond shall be furnished with the bid in an amount not less than 10%. All bids shall be irrevocable for 60 days after the bid opening date as provided by the Act of November 26, 1978 (P.L. 1309, No. 317), as amended by the Act of December 12, 1994 (P.L. 1042, No. 142). Bidders must comply with all State antibid-rigging regulations pertaining to Work associated with this Project, and will be required to submit an executed non-collusion affidavit with the bid. The estimated cost of project exceeds Twenty-five Thousand Dollars ($25,000) and the Pennsylvania Prevailing Wage Act shall apply. Borough of Shippensburg reserves the right to waive any defects, errors, omissions, mistakes, informalities, to accept any bid or combination of bids that are deemed to be in the best interest of the Borough of Shippensburg, and to reject any or all proposals. Requests for clarification are due Friday, July 9, 2021 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. Estimated Project Value: $55,000-$60,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

86 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects