Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 8, 2021

August 9, 2021

No Information to Display

527 Odd Rd

Site Work

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

527 Odd Rd, Ghent, WV

Subscribe to View Full Documents

Estimates are around $200,000 base bid; $40,000 Alternate #1, $100,000 alternate #2. The project includes the replacement of high bay lighting fixtures and installation of lighting control panel, replacement in the welding shop lighting, and replacement of the generator serving New River Community and Technical College. Work includes all fixture mounting accessories, concrete slab expansion, and support structures. The Bidder, if successful and awarded a contract, will receive a notice to proceed from the Owner and agrees that all Work will start from date of Notice to Proceed and that the project will be Substantially Complete in number of days inserted on Form of Proposal by Bidder. Bidder also agrees to achieve Final Completion within 30 days thereafter. The Owner will suffer financial loss if the Work is not Substantially Complete within the Contract Time. For each calendar day of delay in achieving Substantial Completion, the Contractor shall be liable for and shall pay the Owner, not as a penalty but as liquidated damages, in accordance with the following schedule: For each calendar day the project is not Substantially Complete, damages to be assessed at $500.00 (Five Hundred Dollars) per day. Technical questions concerning the bidding documents shall be directed to Scheeser Buckley Mayfield, 1540 Corporate Woods Parkway, Uniontown, OH 44685-8797 (330-896-4664). For each calendar day of delay in achieving Final Completion, the Contractor shall be liable for and shall pay half the amount of liquidated damages stated above, plus any additional fees of the Architect and the Architect's consultants that may accrue. Allowances may be made for delays due to shortages of materials and/or energy resources, subject to proof by documentation, and for delays due to strikes or other delays beyond the control of the Contractor. The Contractor in accordance with the Contract Documents must properly document all delays and any claim for extension of the ContractTime Late bids will not be accepted and will be returned unopened. All applicable federal, state and local laws, rules and regulations apply. Owner reserves the right to accept or reject any/all bids.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.