Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 13, 2021

September 13, 2021

No Information to Display

1707 Main St

Addition, Demolition, Renovation, Site Work

No Information to Display

$36,089,000.00

Public - City

img_map_placeholder

1707 Main St, Sumner, WA

Subscribe to View Full Documents

The District proposes to construct a modernized and expanded Sumner High School under a Phased Master Plan which would fully buildout a replacement High School, including athletic facilities (except for Sunset Chevrolet). The replacement High School will be constructed on approximately 29.49 acres consisting of its existing campus and abutting parcels on Wood Avenue and Mason Street. Except for Sunset Chevrolet Stadium and its associated structures and parking lot, all of the buildings and fields of the existing High School campus will be demolished sequentially as part of Phase 2 in accordance with the Construction Sequencing Plan. The modernized and expanded Sumner High School will house 1830 students and 150 staff within 334,614 total square feet in three main structures together with athletic facilities, all proposed to be built in two phases. The completed replacement Sumner High School will provide state-of-the art academic, technology-supported, visual and performing arts, and career-oriented programs to provide for interdisciplinary studies, collaborative learning, innovative teaching methods, and , and enhanced athletic facilities resources to continue the legacy of excellence and commitment to the community it serves. Estimated Value: $40 to $42 Million Bids received after the time fixed for receipt cannot be considered. Certified check(s), bank cashiers check(s), or bid. bondis) shall be required with the Base Bid(s) equal to five percent (5%) of the Base Bid(s). Make check(s) or bid bond(s) payable to Sumner-Bonney Lake School District No. 320. Listing of Subcontractors: Every Bidder must supply the Subcontractor list completed and. submitted to the Owner at the same location specified for receipt ofBids within one hour ofthe Base Bid time as defined under ROW 39.30.060. The Bidder shall name the Subcontractor with whom the Bidder, if awarded the Contract, will subcontract for performance of the work of: a. heating, ventilation, and air conditioning, b. plumbing as described in RCW 18.106, c. electrical work as described m RCW 19.28, d. fire protection work as described in Section 210000 ofthe Project Manual; and e. any other categories of Work listed on the Subcontractor listing form. Any Bidder who intends to selfperform any of the categories of Work must name itself for each such category of Work. The Owner reserves the right to reject any and all Bids, and to waive any informalities or irregularities in any Bid or in the bidding. Each Bid and other enclosures shall be enclosed in an opaque, sealed envelope, bearing the name and address of the bidder and addressed to the Owner.

35 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects