Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

November 4, 2024

December 31, 2026

Multiple Locations

New Construction

No Information to Display

No Information to Display

Public - State/Provincial

img_map_placeholder

Multiple Locations, Taloyoak, NU

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Wastewater treatment facility (WWTF) in Taloyoak, Nunavut. The project design is required to meet the community's waste treatment requirements for at least 20 years (2023 to 2043). The Consultant will work in collaboration with the GN Team through all the project phases to provide the Hamlet of Taloyoak with an impermeable sewage lagoon that meets or exceeds all applicable environmental and regulatory guidelines and regulations/codes. TIMELINE: Design is ongoing. Tender and construction schedules is undetermined. Further update may be available in spring 2024, upon approvals.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.