Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 23, 2021

August 23, 2021

January 20, 2022

Rivertown Rd

Paving, Site Work

No Information to Display

$407,414.00

Public - City

img_map_placeholder

Rivertown Rd, Fairburn, GA

Subscribe to View Full Documents

The last day for questions is June 18th, 2021, by 3:00pm. An associated Addendum will be provided by June 21st, 2021, if required. The City of Fairburn will accept sealed bids from qualified Contractors for furnishing all labor, equipment, and materials necessary to complete the RIVERTOWN ROAD PEDESTRIAN Improvements PROJECT #21-002. The work includes the removal of existing curb & gutter, sidewalk and driveway aprons, installation of new curb & gutter, installation of new sidewalk, replacement of existing sidewalk as required, and the installation of new ADA handicap ramps. This contract will also include preparation of sub-grade, saw-cutting and demolition of existing asphalt as well as clean up and backfilling. The scope of the base bid will be conducted on the east side of Rivertown Road from the west of Magnolia Lane to west side of Vogue Circle. Add Alternate #1 will have the same general scope but will extend from the west side of Vogue Circle to Virlyn B. Smith Road. The scope of the Add Alternate #2 includes the installation of a Rectangular Rapid Flashing Beacon System, Pedestrian Signal, and associated signage and striping. The overall contract time will be based on the Base Project time plus any/each Add Alternate construction time included in the award to a max of 150 calendar days. No bid may be modified, withdrawn, or canceled for a period of 60 days after time designated for receipt of Bids or until notified by Owner, whichever is sooner. The City reserves the right to reject any and all bids and to waive irregularities, technicalities, and informalities.

13 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects