Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 28, 2021

September 28, 2021

June 8, 2027

4949 Eastgate Mall

Renovation, Site Work

No Information to Display

$11,886,000.00

Public - City

img_map_placeholder

4949 Eastgate Mall, San Diego, CA

Subscribe to View Full Documents

This project entails the construction of a new third Flow Equalization Basin at the North City Water Reclamation Plant. Description of Project: This project entails the construction of a new third Flow Equalization Basin at the North City Water Reclamation Plant. The NCWRP is an active and operational water reclamation facility. It is required that the facility remain in operation at all times, except for City approved planned shutdown intervals during the cutover of new to existing systems. The Scope of Work shall include the following and as shown on the drawings and in specifications: A. Site Civil: Storm drain piping; Bioinfiltration basin; Finish grading; Excavation. B. Yard Piping: Relocation of existing utilities or temporary relocation of existing utilities; Connection of yard piping between existing terminated lines and flow equalization basin. C. Electrical: Relocation and/or protection of electrical duct banks, handholes, light poles; New handholes, duct banks and any associated electrical work with construction of the flow equalization basin. D. Mechanical: All piping and valves associated with construction of the flow equalization basin; Corrosion protection inside flow equalization basin E. Instrumentation and Control: All instrumentation and control associated with the construction of the flow equalization basin. F. Structural: Footings, foundations, walls, roofs, hatches for the flow equalization basin; Equipment pads, pipe supports. G. Architectural: Architectural finishes; Any associated architectural components associated with the completion of the flow equalization basin; Removal of existing translucent wall panels and replacement with new translucent wall panels; Gate with bird screening; New stair, handrails and guard railing in existing stair tower. The NCWRP is an active and operational water reclamation facility. It is required that the facility remain in operation at all times, except for City approved planned shutdown intervals during the cutover of new to existing systems. MBE* WBE* 1. Construction 2% 1% 2. Supplies 1% 1% 3. Services 1% 1% 4. Equipment (combined in above) 1% 1% *This project has been updated for historical data and reference purposes. The information has been provided as it was received and confirmed.

137 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.