Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

May 25, 2021

June 14, 2021

August 16, 2021

Multiple Locations

Paving, Site Work

No Information to Display

$1,271,146.00

Public - County

img_map_placeholder

Multiple Locations, Owatonna, MN

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

13

Subscribe to View Full Documents

The Major Items of Work Are Approximately: Item Number Item Unit Quantity 2104.502/01390 Remove Signal System Each 1 2104.504/00090 Remove Concrete Pavement S Y 1705 2104.504/00120 Remove Bituminous Pavement S Y 7649 2105.609/00050 Select Granular Borrow Ton 4337 2106.507/00010 Excavation - Common C Y 7690 2106.507/00130 Common Embankment (Cv) C Y 5030 2211.509/00070 Aggregate Base Class 5 Ton 4491 2301.504/00090 Concrete Pavement 9.0" S Y 3830 2360.509/23300 Type Sp 12.5 Wearing Course Mix (3;c) Ton 1062 2503.503/19155 15" Rc Pipe Sewer Des 3006 Cl V L F 637 2521.518/00040 4" Concrete Walk S F 10830 2531.503/02120 Concrete Curb & Gutter Design B424 L F 2677 2531.503/04120 Concrete Curb & Gutter Design D424 L F 1888 2545.502/00100 Lighting Unit Type Special Each 15 Expected Award Date:06/08/2021 Project Start Date:06/14/2021 Construction Start Date:06/14/2021 Construction End Date:09/15/2021 Work Type:Reconstruct Project Type:Road and Street Highest Funding Level:State DBE Project:No Bids must be accompanied by a corporate surety bond made in favor of Steele County. Upon execution of the Contract, bid bonds will be returned to the unsuccessful bidders within 30 days of the opening of the bids. The Steele County Board of Commissioners reserves the right to reject any or all bids or to waive defects. For questions, contact Paul Sponholz, Assistant County Engineer, at 507-444-7672 or paul.sponholz@co.steele.mn.us. 153-020-051 6B-D-2021-94615 DOT# 876356D MP: 285.95 Folder: 2922-66 Contract Name: CSAH 34 at CSAH 45 Roundabout Contract Number: 213429 DATE WORK TO BE COMPLETED BY 11/30/2021 WORK TO START ON OR AFTER J U ne 1, 2021 ANTICIPATED START DATE: JUNE 14, 2021 COMPLETION DATE: 45 WORKING DAYS

36 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.