Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 17, 2023

December 13, 2023

No Information to Display

Brittin Rd

Paving, Site Work

No Information to Display

$295,030.00

Public - County

img_map_placeholder

Brittin Rd, Fancy Creek Township, IL

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of October 19, 2023, this project has not yet been awarded. Anticipated award would be on November. City/County: Sangamon The Work Under This Contract Consists of Pipe Culvert Removal, Earth Excavation, Channel Excavation, Topsoil Removal and Placement, Aggregate Base Course, Class a-3 Bituminous Surface Treatment, Double Barrel (2 X Cast-in-place Concrete Box Culvert, and Associated Roadwork, Erosion Control, and Seeding Necessary to Complete the Project. Project Length is 250 Feet. Some Quantities Included in the Contract Are: Earth Excavation 116 Cu Yd; Aggregate Base Course, Type a 325 Ton; Concrete Box Culverts 82.5 Cu Yd; Reinforcement Bars, Epoxy Coated 15,090 Pound; Stone Riprap, Class A4 (Special) 40 Ton; Rockfill-replacement 113 Ton Project Location: Brittin Road (TR 292) over un-named stream, approximately 1.75 miles north of Andrew, IL Proposals requiring prequalification of bidders will be issued only to those contractors who are qualified with the Department of Transportation. Prequalification forms may be secured from the Engineer of Construction, Administration Building, 2300 South Dirksen Parkway, Springfield, IL 62764. ILDOT - Pipe Culvert Removal, Earth Excavation, Channel Excavation, Topsoil Removal and Placement, Aggregate Base Course - 14-12116-01-BR

6 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.