Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 30, 2026

No Information to Display

Division Ave

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Division Ave, Eugene, OR

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The Division Avenue Safety Improvements Project aims to address a concentration of crashes between River Road and where Division Avenue diverges from Randy Pape Beltline, many of which have been caused by turning vehicles failing to yield to oncoming traffic. To address documented safety challenges along this segment, the project will include: Three roundabouts constructed from low-cost temporary materials, such as flexible delineators or jersey barriers; The reduction of travel lanes from two in each direction to one in each direction; Marked crossings for people walking and biking at all four legs of the three roundabout intersections; o Turn diverters to ensure correct traffic circulation; Traffic calming from where Division Avenue diverges from Randy Pape Beltline to Lone Oak Way to slow drivers before they enter the series of roundabouts; and o Bike lanes that are buffered and protected with flexible delineators. As of August 3, 2023, this project is currently in the FY 2023-2029 CIP. Per owner, there has not been a design team selection process yet. The design is anticipated to begin in 2024 but we have not yet received the NTP. Construction is tentatively scheduled for 2026. The project is programmed to receive federal funds through the Statewide Transportation Improvement Program.

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.