Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 7, 2023

January 8, 2024

June 9, 2025

3251 Patritti Ave

Paving, Site Work

No Information to Display

$15,000,000.00

Public - City

img_map_placeholder

3251 Patritti Ave, Baldwin Park, CA

Subscribe to View Full Documents

The improvements consist of the installation of a subsurface storm water infiltration system, a diversion structure, water quality inlets, diversion piping with control valves and flow meters, storm water pretreatment system, expansion and rehabilitation of the onsite parking lot, new diagonal parking along Patritti Avenue, new/improved play fields, walkway improvements, storm drain improvements in the neighborhood, construction of ADA accessible entrances to the park, irrigation system replacement, planting of drought-tolerant landscaping, installation of new play equipment, installation of picnic tables and BBQ grills, park expansion to the north (Futsal court), restroom addition in the community center, improved basketball courts, and swales. These improvements (along with others shown in the Contract Documents), when completed, will finalize the Barnes Park Multi-Benefit Storm water Capture Project. Contractor shall commence the services pursuant to these specifications upon receipt of a written notice to proceed and shall perform all services within 370 days. bidders bond made payable to the City of Baldwin Park or issued by a surety admitted to do business in California, for an amount equal to at least ten percent (10%) of the amount bid. A faithful performance bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for completion of this contract, separate labor and material payment bond in an amount equal to one hundred (100) percent of the contract price shall be furnished as security for payment of all persons performing labor and furnishing materials in connection with this contract. New Question Deadline 10/23/2023 at 5:00 PM In accordance with the provisions of Sections 1770 et seq., of the Labor Code, the Director of the Industrial Relations of the State of California has determined the general prevailing rate of wages applicable to the work to be done Prior to contract execution, the contractor and his/her subcontractors shall obtain a City of Baldwin Park business license It is agreed by the parties that if the improvements are not completed by the time prescribed to complete the work, City and Contractor agree that Contractor will pay to City, not as a penalty, but as predetermined liquidated damages, the sum specified in the Construction contract / Agreement (Five Hundred Dollars - $500.00 - per day) for each and every working days delay beyond the time prescribed to complete the work. The City of Baldwin Park reserves the right to reject any and all bids and to waive any minor irregularities in the bid documents

66 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects