Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 10, 2022

October 10, 2022

October 31, 2022

33238 US Hwy 285

Renovation, Site Work

No Information to Display

$2,000,000.00

Public - County

img_map_placeholder

33238 US Hwy 285, Jefferson, CO

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

The main ranch house at the Tarryall/Cline Ranch was built in 1928. The structure is a two-story rectangular plan wood frame building resting on a stone and concrete foundation that extends approximately 32 inches above grade. Exterior finish is stucco. The house features its original flat (sloping from south to north) and parapeted roof with a built-up asphalt felt type of roofing system with a gutter and downspouts on the north elevation. The flat roof was overframed with a large gable roof with asphalt shingles from the 1980s. The south (primary) elevation features a broad, full-width untooled fieldstone porch with a low-pitch hipped roof and right-hand stepped entry. The main ranch house is an example of the Pueblo Revival style with elements of the Spanish Eclectic style, which is very unusual and rare for a ranch house in Colorado from the first half of the 20th century. Scope of Work: Phase a. Stabilize SE corner foundation section. Install shoring, and weatherize the opening as needed. b. Install sheathing, acrylic panels over window rough openings where needed. c. Recommend further weatherizing strategies, and install where needed. Sections of the existing building that must be addressed: This project must be completed within 21 days after contract is executed. 1. Cline Ranch main house Rehabilitation / Construction: Phase I - Foundation, Structural, and Building Envelope Rehabilitation Phase II - Interior Rehabilitation *These phases are subject to division and change due to funding availability.

10 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.