Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 2, 2023

December 4, 2023

September 24, 2025

Multiple Locations

Site Work

No Information to Display

$400,000.00

Public - City

img_map_placeholder

Multiple Locations, Long Beach, CA

Subscribe to View Full Documents

The rehabilitation, development, and equipping of two (2) potable water supply wells, Wells Commission 14 and Citizens 10, each with a design capacity of 3,000 gallons per minute (gpm) The Owner reserves the right to reject any or all bids, to waive any informality in a bid, and to make award to the lowest responsible bidder as it may best serve the interest of the Owner The Contractor shall possess a valid California C-57 Water Well Drilling Contractor license at the time the Contract is awarded. The Contractor or subcontractor shall also possess a valid C-10 Electrical Contractor license at the time the Contract is awarded. Failure to possess the specified licenses may render the Bid as non-responsive. This project is a public work under Labor Code 1720 et seq. Pursuant to Division 2, Part 7, Chapter 1 of the Labor Code of the State of California, the Director of Public Works of the City by and on behalf of the City Council has obtained from the Director of the Department of Industrial Relations of the State of California the general prevailing rate of per diem wages, and the general prevailing rate of holiday and overtime work in the locality in which the public work is to be performed for each craft, classification or type of workers needed to perform the Work. Copies of prevailing rate of per diem wages are on file in the office of the City Engineer, 5th floor, City Hall, 411 West Ocean Boulevard, Long Beach, California 90802, and shall be made available upon request This section applies to switchboards rated 600 volts and below. B. Provide Switchboard(s) as specified herein and shown on the Drawings. C. All wiring, wire color codes, wire labeling and terminal blocks within the switchboard shall be as specified in Section 26 05 70 - Low Voltage Wire and Data Cables. D. The switchboard scope of work includes: 1. Providing switchboard structure and all internal components. 2. Installation of the switchboard on concrete pad per details. 3. Submittal data and drawings. 4. Startup and configuration of switchboard internal components. 5. Factory and field testing. 6. Operation and maintenance manuals. 7. Warranty of all components. 8. Seismic Anchorage Design Calculations and conforming installation. 9. Conduit - support systems, wire, and grounding system, for equipment interconnection, and operation. 10.System calibration, testing and documentation. E. Furnish all required labor, materials, safety equipment, transportation, test equipment, incidentals and services to perform factory and/or field testing per Section 26 05 70 - Factory and Field Testing. F. All electrical equipment and materials, and methods - including installation, calibration, and testing - shall conform to the applicable codes and standards listed in this and other Sections. All electrical materials and work shall conform to published standards of the National Electric Code (NEC), Institute of Electrical and Electronic Engineers (IEEE), and Underwriters Laboratories Inc (UL). The Contractor, simultaneously with the execution of the Contract, will be required to furnish a payment bond and a performance bond, each in an amount equal to one hundred (100) percent of the Contract Price. Said bonds shall be secured from a surety satisfactory to Owner and who is authorized to transact business in California. Said bonds shall continue in full force and effect for the guarantee period. Bidders must scan and upload with their bid documents a certified check or bank draft payable to the Long Beach Utilities Department, drawn on a solvent bank in the United States of America, or a satisfactory bond in an amount not less than 10 percent of the Bid. Any questions shall be submitted to Ryan Hiney at ryan.hiney@lbwater.org. Include the subject line: "Rehabilitation of Wells Commission 14 and Citizens 10 (EO-3553, WD-21-22): Question". The deadline for questions is 4:00 PM on Thursday, October 12, 2023. All questions should be submitted via email to Mr. Matthew Cruz at Matthew.Cruz@lbwater.org with the subject "Spec. No. WD-21-22 Questions".

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.