Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

March 3, 2025

No Information to Display

SE 3rd St

Renovation, Site Work

No Information to Display

$2,470,000.00

Public - City

img_map_placeholder

SE 3rd St, Ankeny, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Construction of storm sewer infrastructure improvements in underserved sections of the SE 3rd Street area, which is located south of East 1st Street, north of SE Peterson Drive, east of South Ankeny Boulevard and west of SE Trilein Drive. The proposed storm sewer infrastructure improvements will include footing drain/sump collector lines, storm sewer pipe, and associated intakes, utility accesses and related pavement removal and replacement necessary to install collection storm sewer in the area. The proposed improvements schedule will include constructing new storm sewer along SE 4th Street from SE Grant Street to SE Sharon Drive and along SE Lawrence Drive from SE Sharon Drive to SE Trilein Drive in 2024. New storm sewer along SE Uehlamar Drive from SE Grant Street to SE Sharon Drive and along SE 2nd Street from SE Sharon Drive to SE Trilein Drive is being proposed for construction in 2025. The purpose of the project is to address areas that lack storm sewer infrastructure or have known capacity issues within the existing storm sewer network. The June 30, 2018 extreme flash flooding event and other high intensity rainfall events in the past several years have demonstrated the need for adding storm sewer infrastructure in this low-lying area with poorly-drained soils. Adding sump collector lines and storm sewer will help reduce drainage issues and minor flooding on public and private properties. The project's proposed schedule includes survey and design work in 2023 through 2024 and construction of the projects in 2024 through 2025. The construction cost estimate for 2024 includes $100,000 of water main replacement (upgrade existing 4" to new 8") along SE 4th Street. As December 22, 2022, this project is currently in the FY 2023 - 2027 CIP. Funding for this project is allotted in the city's capital improvement plan for construction FY 2025. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2025. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of August 22, 2023, no new information available

1 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.