Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

December 17, 2020

January 18, 2021

No Information to Display

Multiple Locations

Renovation

No Information to Display

$225,369.00

Public - City

img_map_placeholder

Multiple Locations, Blackshear, GA

Subscribe to View Full Documents

Capital Fund Program, Housing Authority of the City of Blackshear, Georgia, Developments GA134001 - McDuffie Homes, GA134002 - Fannie Gray Homes, GA134003 - Ware Street Homes, & GA134004 - 235 The proposed Bid Package reflects the Modernizations and Improvements at Four (4) Developments consisting of Three (3) separate Development Sites and Nine (9) randomly placed Homes, all totaling Thirty (30) Buildings Housing Fifty-Five (55) Apartments. Scope Of Work shall vary across the Sites ranging from Bathroom Improvements/UpGrades, Sheetrock Ceiling Improvements, and Interior Safety Smoke Alarm Devices. A certified check or bank draft, payable to the Housing Authority of the City of Blackshear, Georgia, U. S. Government bonds or a satisfactory bid bond executed by the bidder and acceptable sureties in an amount equal to five (5%) percent of the bid shall be submitted with each bid. Each bidder shall submit with bid a Statement of Bidder's Construction Experience and Previous Participation Certificate (HUD-2530), and Representations, Certificates, and Other Statements of Bidders (HUD-5369-A). The successful bidder will be required to furnish and pay for satisfactory performance and payment bond or bonds. Attention is called to the provision for Davis Bacon/Section 3 equal employment opportunity, and payment of not less than the minimum salaries and wages as set forth in the General Conditions must be paid and reported on this project. Further the Project is funded through American Recovery And Reinvestment Act mandating the Buy American and job status reporting requirements. The Local Authority reserves the right to reject any or all bids or waive any informality in the bidding. All prospective bidders are urged to visit the site and familiarize themselves with job conditions. No bids shall be withdrawn for a period of sixty (60) days subsequent to the opening of bids without the consent of the Housing Authority of the City of Blackshear, Georgia.

18 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.