Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 10, 2020

December 10, 2020

January 24, 2021

465 Westminster St

Renovation

No Information to Display

$92,000.00

Public - City

img_map_placeholder

465 Westminster St, Fitchburg, MA

9

4

3

Subscribe to View Full Documents

Remediation work at former Central Steam Plant.The goal of the proposed remediation work is to physically clean and remove and/orotherwise mitigate/control petroleum in the subsurface to prevent oil sheening on the North Nashua River. The proposed plan is to physically remove residual petroleum that likely resides along the land side of a section of the retaining wall and then to installorganic adsorbent media and a permeable reactive barrier system to mitigate any residual oils that may migrate towards the wall but not prohibit the natural flow of groundwater.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects