Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 2, 2020

January 4, 2021

September 27, 2021

Columbus St

Addition

No Information to Display

$2,689,868.00

Public - City

img_map_placeholder

Columbus St, Grove City, OH

Subscribe to View Full Documents

**As of December 1, 2020. Project has not been awarded. A Timeline for award has not been established yet. Construction of a new roadway connecting existing Columbus Street west of Broadway to a termination point to the northwest. The proposed roadway improvements will include subgrade stabilization, full-depth asphalt pavement, brick roadway, brick walks, concrete walks, landscaping and street lighting system. Construction of a new parking lot. The proposed parking lot improvements will include construction of a new dumpster enclosure, new access drives, lighting and landscaping. Extensive underground infrastructure including 24-inch and smaller storm sewers, underground stormwater storage chamber system, 8-inch waterline extension and utility duct bank are included in the scope of the improvement. Construction of a new at-grade railroad crossing and removal of the existing railroad crossing on Grant Avenue. Additional Bid 1 Construction of an additional underground stormwater storage chamber system. Additional Bid 2 Railroad crossing improvements on Southwest Boulevard. The estimated costs of construction for the work outlined in the plans and specifications for the various bids are: Base Bid: $ 2,925,000.00 Additional Bid 1: $ 260,000.00 Additional Bid 2: $ 301,000.00 installation of temporary sediment controls; demolition, clearing and grading; installation of the proposed site infrastructure; construction of the proposed roadway development; and permanent stabilization of the disturbed areas. i. Extension/Realignment of Columbus Street A. Shard Street/Brick Concept B. Local Storm Drainage C. Waterline Extension/Replacement D. Conduit Duct Bank ii. New Public Parking Lot A. Storm Drainage B. Lighting System C. Underground Detention System D. Dumpster Enclosure E. Landscaping iii. New At-Grade Rail Crossing A. Abandonment of Grant Avenue Rail Crossing iv. Additional Bid No 1 A. Second Underground Detention System v. Additional bid No. 2 A. Upgrade of At-Grade Crossing - Southwest Boulevard

43 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects