Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

October 26, 2023

December 25, 2023

July 22, 2024

24 Gallup Hill Rd

Paving, Site Work

No Information to Display

$2,674,800.00

Public - City

img_map_placeholder

24 Gallup Hill Rd, Ledyard, CT

Subscribe to View Full Documents

he Town of Ledyard seeks sealed bids for the installation of a 5,600 linear foot multi-use pathway with 1,200 linear feet of appurtenant sidewalk. As of October 7, 2022, an engineer has been selected and this project is in the final planning phase. Although a firm timeline for construction has not been determined, it is anticipated bidding will commence in winter 2022 and construction starting in 2023. This project includes a force sewer main below the pathway. *The closed solicitation has been included below for reference: The Town of Ledyard ("Town") is accepting proposals and qualification statements from professional engineering firms or teams licensed in the State of Connecticut to provide engineering services in connection with its proposed "Ledyard High School Multi-Use Pathway & Sidewalk Extension" Project ("Project"). The funding source for the proposed project is the State of Connecticut Department of Transportation ("CTDOT") under the Local Transportation Capital Improvement Program (LOTCIP) administered by the Southeastern Connecticut Council of Governments ("SCCOG"). The firm(s) should be able to demonstrate a successful track record in working on infrastructure projects in Connecticut and the knowledge & expertise of relevant regulatory requirements. A pre-application for the Project submitted by the Town to SCCOG was deemed to have an eligible purpose & need and the Town of Ledyard has received approval to submit a full application in conformance with CTDOT and SCCOG guidance. An acceptable application will include all necessary inclusions, certifications and provide preliminary design plans. The method of contractor selection has not been determined at this time. The Town of Ledyard seeks sealed bids for the installation of a 5,600 linear foot multi-use pathway with 1,200 linear feet of appurtenant sidewalk.

11 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.