Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

July 7, 2024

July 7, 2025

Multiple Locations

Paving, Site Work

No Information to Display

$10,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Matagami, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Replacement work of culverts, reconstruction and repair of bridges, rehabilitation of pavement and granular charging for some roads north of the 49th parallel TIMELINE: Design is ongoing. Construction work is planned for 2024: Replacement of five culverts between km 41 and km 55 of Wemindji Road; Repairs of bridge P-10706 over Sabascunica River at km 32 of Wemindji Road; Repairs of bridge P-10707 over Peuplier River at km 65 of Wemindji Road. Repairs of bridge P-10691 over Bell River at km 44 of Road 19900 (R-1005); Repairs of bridge P-19334 over Opaoka River at km 67 of Road 19900 (R-1005); Repairs of bridge P-10690 over Laflamme River at km 34 of Road 19900 (R-1005). Further update in winter, 2023/2024. Note: Tenders have been issued for the following work: Repairs of bridge P-20354 over Sinclair Creek at km 47 of Road 19900 (R-1005) is covered in the report under ID name: Replacement of a Culvert by Structure P-20354 at km 47 of Route 19900. Granular resurfacing of the road between km 52 and km 80 of route 19900 (R-1005) is covered in the report under ID name: Granular Resurfacing of Route 19900 Between Km 52 and Km 81.

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects