Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

July 9, 2020

August 10, 2020

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$540,808.00

Public - City

img_map_placeholder

Multiple Locations, Plain City, UT

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The work consists of the following work in existing City streets: asphalt leveling course, overlaying over 12,000 s.y. of existing pavement, raising and collaring existing manholes and valves, applying chip seal with fog coat on over 85,000 s.y. of existing City streets and all other items required to complete the Work as specified in the contract documents. All work specified in the Contract Documents shall be completed within 45 days of the Notice to Proceed. However, all work must be completed prior to September 15, 2020. Each bid shall be accompanied by a certified check, cashier's check or bid bond in the amount of five percent of the total bid price, made payable to Plain City Corporation as guarantee that the bidder, if his bid is accepted, will promptly execute the Contract, and furnish a satisfactory, faithful performance bond in the amount of one hundred percent of the contract price and a payment bond in the amount of one hundred percent of the contract price. A waiting period of three weeks from the date of opening of bids to award of contract may be required. Bidders shall assume full responsibility for and shall guarantee the bid price during this period and make certain the time period is stated in and does not restrict the proposal guarantee. All questions relative to this project prior to opening of bids, shall be directed to the Project Engineer. It shall be understood, however, that no specification interpretations will be made by telephone, nor will any "or equal" products be considered for approval prior to award of contract. Plain City Corporation reserves the right to reject any or all bids, to waive any informalities in a bid, and to make awards in the interest of the City.

7 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects