Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 3, 2020

June 25, 2020

September 3, 2020

10050 Boulevard Gouin E

Paving, Site Work

No Information to Display

$580,926.00

Public - State/Provincial

img_map_placeholder

10050 Boulevard Gouin E, Montreal, QC

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Reference number : 1369649 Deadline for receipt of complaints: 2020-05-20 Electronic submission accepted: No Expected duration of the contract (in months): 7 Nature of the Bid Guarantee: Guarantee Bank draft Check certified (certified) Money order Irrevocable letter of guarantee Value of the Bid Guarantee (amount or percentage) The bid security required is 10% of the total value of the bid. The Pointe-de-l'Île school board is calling for tenders to replace the schoolyard paving . All tenderers must comply with the requirements contained in the tender documents and its addenda, if applicable. Timeline The Contractor may mobilize on the work site, from June 25, 2020 . The start date for the works is June 25, 2020 . The date of acceptance with reservation of works is August 20, 2020 . This date established the end of the works. The correction of deficiencies must be completed no later than September 3, 2020 , i.e. 14 days following the date of acceptance with reservation of work. Unqualified acceptance of the work is scheduled for November 2, 2020 , sixty (60) days following the end date of the deficiency correction period. No one can claim not to know the conditions existing at the time of carrying out the work. No verbal information provided during this visit engages the responsibility of the School Board. Reserve The school board reserves the right not to accept any of the submissions received. Bid bond 10% is required. Performance bond and obligation bond for wages, materials and services of each corresponding 50% is required.

14 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects