Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 10, 2020

September 21, 2020

December 15, 2021

Multiple Locations

Site Work

No Information to Display

$50,000,000.00

Public - County

img_map_placeholder

Multiple Locations, Stephens City, VA

Subscribe to View Full Documents

The proposed project has been conceived to construct a quarry water intake structure, raw water pumping system, and raw waterlines to the new filtration plant site. A Progressive Design Build delivery, following the Authoritys Design- Build Procedures, is being sought for this Project in order to meet the required timeframe for construction, achieve the benefit of design flexibility and to allow Authority to work in partnership with the selected Design-Builder for the most cost effective and reliable solution. One objective of the Project is to provide 8.3 MGD of raw water from the East Pit quarry to the new WTP in order to serve the customers of the Authoritys water system. The following outlines the anticipated outcome of the Project; East Pit Quarry raw water intake; Raw Water pumping system; Raw waterline from the pumping system to a tie-in point outside of the new WTP; Project Schedule: It is anticipated that the Progressive Design-Build Contract will be executed on or about August 21, 2020. The design, permitting, construction and performance testing of the completed Project are expected to be completed no later than December 15, 2021. The Frederick Water reserves the right to reject any and all Statement of Qualifications Inquiries and questions should be addressed to: chenry@frederickwater.com A letter from the Design-Builders surety must be provided to verify the availability of a design-build bond or bonds (covering both performance and payment) of at least $ 5 million for this Project. The surety must be authorized by law to do business in Virginia and must have an A.M. Best Company Rating of A minus VIII or better. The surety must also be listed in the U.S. Department of Treasurys Circular 570

65 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.