Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

December 25, 2023

No Information to Display

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Columbus, OH

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

As of May 10, 2023, an engineer firm has been selected and confirmed. This project is in the design phase. A firm timeline for construction has not been established. The closed solicitation has been included below for reference. Scope: Visual inspections indicate that the existing sills of the stop log gates along the Franklinton Floodwall are deteriorating . This deterioration presents a safety concern due to the undermining and settlement of various elements within the sills, which create flow paths for flood waters below the stop log gates when installed. The existing sills are intended to provide flood protection for the Franklinton area as part of the WCLPP. This project will re-design and replace the existing sills to ensure that flood waters can be effectively retained by the stop log gates when installed. These improvements will 1) meet the current Army Corps of Engineers requirements; 2) eliminate the current safety concerns presented by the deteriorating sills; 3.) address concerns/issues with the post-pcoket designs, and 4) allow for reliable flood protection. In addition to the gate sill repairs, this project will address the concrete wall sections of the WCLPP which shall consist of visually inspecting both sides of the Floodwall (wet and dry), identifying and quantifying the areas where spalling and cracking have occurred, and developing standard details and specifications for the various types of concrete repairs that will be necessary. The method of contractor selection has not been determined at this time.

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects