Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

February 5, 2024

No Information to Display

Multiple Locations

Paving, Site Work

No Information to Display

$246,000,000.00

Public - State/Provincial

img_map_placeholder

Multiple Locations, Saint Louis, MO

Our team is requesting plans for this project.

Subscribe to View Full Documents

REQUEST FOR LETTERS OF INTEREST FOR DESIGN-BUILD SERVICES As of October 2023, A Design-Build Team has been selected. Construction is slated to begin in early 2024 and complete at the end of 2026. Project details include: Constructing an additional lane on I-55 in both directions from Route Z to US 67 Replacing intersection of US 67 and Route CC with grade separated interchange Constructing new interchanges at Route Z, McNutt, and US 67/I-55 Adding lanes at the SB I-55 to SB US 67 ramp and the NB 67 to NB I-55 ramp Replacing 14 bridges Rehabilitating 12 bridges.

8 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects