Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 24, 2024

No Information to Display

Hickman Rd

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Hickman Rd, Urbandale, IA

Our team is requesting plans for this project.

Subscribe to View Full Documents

UPDATE : https://www.urbandale.org/DocumentCenter/View/13378/2023-2028-Capital-Improvements-Plan Proposed is the installation of a 10ft wide trail on the north side of Hickman Road near the new Parks and Public Works Maintenance Facility. To the east of the new facility is a railroad viaduct with limited room between the north curb line of Hickman Road and the bridge pier. In discussions with the railroad they stated that they would support placing the 10ft trail north of the bridge pier to get the trail away from Hickman Road. This would involve constructing a new retaining wall through this area. During 2021 and 2022, the City worked with an engineering consultant to prepare a preliminary set of plans, have additional discussions with the railroad and prepare an updated cost estimate. Project is included in City of Urbandale FY 2023-2028 CIP Page 78 ------------------------------------------------------------------------------------------------------------------------------------------ UPDATE : https://www.urbandale.org/DocumentCenter/View/12280/2022-2027-Capital-Improvements-Plan Proposed is the installation of a ten foot wide trail on the north side of Hickman Road near the new Parks and Public Works Maintenance Facility. To the east of the new facility is a railroad viaduct with limited room between the north curb line of Hickman Road and the bridge pier. In discussions with the railroad they stated that they would support placing the ten foot trail north of the bridge pier to get the trail away from Hickman Road. This would involve constructing a new retaining wall through this area. During 2021, the City worked with an engineering consultant to prepare a preliminary set of plans, have additional discussions with the railroad and prepare an updated cost estimate. Project is included City of Urbandale FY 2022 -2026 CIP Page 82. ----------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------------- Proposed is the installation of a ten foot wide trail on the north side of Hickman Road near the new Parks and Public Works Maintenance Facility. To the east of the new facility is a railroad viaduct with limited room between the north curb line of Hickman Road and the bridge pier. In discussions with the railroad they stated that they would support placing the ten foot trail north of the bridge pier to get the trail away from Hickman Road. This would involve constructing a new retaining wall through this area. During 2020, the City worked with an engineering consultant to prepare a preliminary set of plans, have additional discussions with the railroad and prepare an updated cost estimate. The project is included in the City's 2022-2026 Capital Improvement Program (CIP). As of January 28, 2022, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of July 31, 2023, no new information available

3 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.