Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

June 28, 2024

No Information to Display

W Bender Blvd

Paving, Site Work

No Information to Display

$7,500,000.00

Public - City

img_map_placeholder

W Bender Blvd, Hobbs, NM

We’ve obtained documents for this project and are currently processing them.

Subscribe to View Full Documents

Professional Surveying and Professional Engineering services to conduct Right-of-Way Surveying, Topographic Surveying, Utility Surveying, Drainage Analysis and Storm Drainage System Design, Engineering Design, and Construction Plans, Specifications, and Bid Document Development for the West Bender Roadway Project. The project will include two phases 1); design a Phase I rural cross section for the widening of West Bender from Grimes Street to West County Road with storm drainage improvements and the reconfiguration of the intersection of West Bender and State Road 18 including preparation of Construction Plans, Project Manual, and Bidding Documents; and 2) provide Right-of-Way surveying, mapping for the Engineering Design for a future Phase II urban cross section of West Bender from State Road 18 to West County Road to widen the roadway including drainage analysis and reconfiguration, environmental assessment, and other required items to comply with all New Mexico Department of Transportation (NMDOT) requirements. In case of ambiguity or lack of clarity, the City of Hobbs, New Mexico reserves the right to adopt the most advantageous thereof, or to reject any or all proposals and waive irregularities. As of October 19, 2023, a design team has been identified. Per owner design timeline is 18 months and construction timeline is to be determined.

5 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.