Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

November 16, 2023

February 1, 2024

July 18, 2024

Multiple Locations

Paving, Site Work

No Information to Display

$2,380,235.00

Public - City

img_map_placeholder

Multiple Locations, Temecula, CA

31

25

4

Subscribe to View Full Documents

As of December 19 2023, all bids for this project have been rejected. At this time, it has not been confirmed if the project will be rebid. Bid is Rejected The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be done hereunder consist of: Construction of a multi-purpose trail under-crossing along the Santa Gertrudis Creek Channel under the existing Margarita Road bridge. Construction will consist of construction of a AC paved multi use trail, channel excavation, structural excavation, retaining wall construction (standard and tie-backs), fencing, cable rails, concrete sidewalk, landscape and irrigation restoration, signs and striping, relocation of recycled waterline main, work within Riverside County Flood Control and Water Conservation District right of way, and all necessary traffic control. Online Q&A Yes Q&A Deadline 11/09/2023 2:00 PM (PDT) Questions pertaining to this project shall be directed to William Becerra, and only submitted through the Planet Bids website. Pre-Bid Meeting No Bid Valid 90 days Liquidated Damages $1,000 per calendar day Estimated Bid Value $2,130,000.00 Start/Delivery DateTo be determined Project Duration 120 Working Days Questions pertaining to this project shall be directed to William Becerra, and only submitted through the Planet Bids website. The work to be done consists of furnishing all materials, equipment, tools, labor and incidentals as required by the Contract Documents to construct for the above-stated project. The general items of work include construction of a multi-purpose trail undercossing along the Santa Gertrudis Creek Channel under the existing Margarita Road bridge. Construction will consist of construction of a AC paved multi use trail, channel excavation, structural excavation, retaining wall construction (standard and tie-backs), fencing, cable rails, concrete sidewalk, landscape and irrigation restoration, signs and striping, relocation of recycled waterline main, work within Riverside County Flood Control and Water Conservation District right of way, and all necessary traffic control.

106 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.