Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

January 16, 2024

March 18, 2024

June 3, 2024

Irvine Center Dr

Paving, Site Work

No Information to Display

$7,290,000.00

Public - City

img_map_placeholder

Irvine Center Dr, Irvine, CA

58

6

14

4

Subscribe to View Full Documents

Rehabilitation of Irvine Center Drive from Pacifica to Lake Forest Drive. Work consists of rehabilitating pavement surface and sidewalk replacement. As of November 17, 2020, this project is currently in the City of Irvine FY 2019-2023 CIP. Funding for this project is allotted in the city's capital improvement plan for construction Fy 2021. A firm timeline has not been established; however, construction is scheduled for Fiscal Year 2021. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. The work to be performed hereunder is located in the City of Irvine, County of Orange, on Irvine Center Drive Pavement from Pacifica to Lake Forest Drive. DESCRIPTION OF WORK: The work to be performed shall include, but not be limited to: Cold milling, removing, excavating, and replacing AC pavement, AC pavement surface course overlay, adjusting valve covers, pull boxes, and manhole covers to grade, removing and replacing damaged concrete curb, gutter and sidewalk, modify curb ramps and access driveways, signing and striping, and other items not mentioned here, but as required by the plans and Special Provisions. The Engineer's construction cost estimate for the project is above $7,290,000 (rounded to the nearest ten thousand)

55 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.