Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 24, 2022

September 23, 2022

June 1, 2023

Codfish Hill Rd

Site Work

No Information to Display

$349,009.00

Public - City

img_map_placeholder

Codfish Hill Rd, Bethel, CT

Subscribe to View Full Documents

As of September 6, 2022, this project has not yet been awarded. A timeline for award has not yet been established. Question Submission Deadline: July 29, 2022 Questions Answered-By Date: August 3, 2022 Construction Completion Deadline: June 1, 2023 Minority/Women/Disadvantaged Business Enterprises are encouraged to bid. The Town of Bethel affirms that in any contract entered into pursuant to this advertisement, said business enterprises will be afforded full opportunity to submit bids in response to this invitation, and that they will not be discriminated against on the grounds of race, national origin, or sex in consideration for award. The project is proposing the removal of the existing culvert and the installation of a precast 7 ft width x 4 ft height x 35 ft length box culvert along with the stabilization and reconstruction of the existing slopes and road, as per the design plans prepared by Wright-Pierce, titled "CONSTRUCTION DRAWINGS FOR CODFISH HILL ROAD CULVERT REPLACEMENT," dated February 26, 2021, and the design specifications titled "BIDDING AND CONTRACT REQUIREMENTS AND SPECIFICATIONS," dated March 1, 2021, that are attached to this bid package. This project shall include all related site work. The selected Contractor shall complete project tasks that include, but are not necessarily limited to, the following: - Installation of Sediment and Erosion Control Measures as per the design plans - Demolition and removal of existing culvert - Installation of the proposed precast box culvert as per the design plans - Reconstruction of the slopes, roadway, and utilities as per the design plans - Provision of maintenance and protection of traffic (MPT) as needed, including a sign plan for Town review showing road closure, perimeter warning, traffic detour, and legal signs - Completion of As-Built Drawing signed by a licensed Land Surveyor - The Town requires that the project is complete by June 1, 2023

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.