Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

September 12, 2019

October 14, 2019

November 28, 2019

105 Garfield Ave

Renovation

No Information to Display

$69,975.00

Public - State/Provincial

img_map_placeholder

105 Garfield Ave, Eau Claire, WI

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe to View Full Documents

Project has been canceled. In general, the work consists of: Replacement of Variable Frequency Drives (VFD) at chiller number 1 in Upper Campus Chiller Plant. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements. All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. All bids received from contractors who are not certified will be rejected. These changes take effect January 1, 2014. Contractor certification applications and instructions for completing the form may be obtained from the DOA electronically. Construction bidding documents may also be available at electronically. Additional project construction bidding information, including plan holders list, is available on the DFD electronically. Please note that a login and password are required to download bidding documents. Interested parties may request a login and password at the DFD electronically allow 2 days to process login and password requests. A bid bond prepared on the Bid Bond Form bound herein, payable to the State in the amount not less than ten percent of the maximum bid shall accompany each bid as a guarantee. A bank certified check or a cashier's check may accompany each bid as a guarantee pursuant to Wis. Stat. s. 779.14(1m)(c)2.b. and 779.14(1s). Failure to enter into the contract with the state (including failure to obtain certificate of insurance and separate performance and payment bonds) may result in forfeiture of the Bid Bond. The company issuing the Bonds must be licensed to do business in Wisconsin.

12 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Related Projects