Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

August 3, 2023

October 2, 2023

November 30, 2023

Multiple Locations

Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

Multiple Locations, Austin, TX

Subscribe to View Full Documents

The Work consists of approximately 7,939 LF of wastewater pipe being removed and replaced divided into three (3) groups: Group 2. 1547 LF of 6" diameter pipe and 3192 LF of 8" diameter pipe being removed and replaced south of N. Capital of Texas Highway in Wildridge Drive and including Rockcrest Circle, Bluffridge Drive, Wildridge Drive, Greenridge Place, and Cliffwood Cove (Grids H-32 and J-32). Group 5. 505 LF of 6" diameter pipe and 1,680 LF of 8" diameter pipe being removed and replaced south of Highway 183 near Fathom Circle and including Oceanaire Boulevard and Fathom Circle (Grids G-36 and G-37). Group 6. Approximately 379 LF of 6" diameter pipe and 636 LF of 8" diameter pipe being removed and replaced south of N. Capital of Texas Highway near Alverstone Way and including Alverstone Way and Appalachian Drive (Grids H-32). Work within each project group includes bypass pumping, wastewater service connections, trench observation for void and water flow, erosion and sedimentation controls, traffic controls, and gutter to gutter mill and overlay for final pavement restoration including pavement markings. Work also includes removal and disposal of abandoned asbestos cement pipe, where encountered Location of Project A. The Project is divided into Groups 2, 5, and 6, that respectively begin at Rockcrest Circle, Bluffridge Dr, Wildridge Dr, Greenridge Place, Cliffwood Cv, Oceanaire Blvd, Fathom Circle, Alvestone Way, Appalachian Dr, Bramblecrest Dr . The project location/route is shown on the Drawings.

9 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.