Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 1, 2024

November 30, 2025

Airport Road

Demolition, New Construction, Site Work

No Information to Display

$42,000,000.00

Public - State/Provincial

img_map_placeholder

Airport Road, Inuvik, NT

Our team is requesting plans for this project.

Subscribe to View Full Documents

Construction of a new 2,830-square-metre Air Terminal Building (ATB) to replace the existing facility. The main floor is raised off the ground to provide an air space under the building as recommended in the geotechnical analysis. Main level consists predominately of public space and Airport Operations. Second level includes public access to Airport Administration, secure suite and building services. Levels three through five include secure space, providing a control tower height to meet required specifications. A separate services building will allow for the recommended raised main floor, with airspace, for the ATB. The services building houses the boilers, pumps, fire pump, domestic hot water, domestic water tanks, sewage tank, fire water tanks and fire pump. These utilities are connected to the ATB by way of a utilidor. Location is directly west of the existing terminal, formerly occupied by the old RCMP building. TIMELINE: Project is pending funding approvals. Plans are complete. Joint federal and provincial funding for the project has been announced. Timelines for tenders and construction may be confirmed in spring, 2024.

4 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.