Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

June 5, 2019

August 6, 2019

No Information to Display

To Be Determined

Paving, Site Work

No Information to Display

$2,587,483.00

Public - County

img_map_placeholder

To Be Determined, Omaha, NE

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

The amount of the engineer's estimate of the cost of said improvements (exclusive of engineering, fiscal, legal, interest, easement acquisition, and miscellaneous costs) is $1,947,000.00. E & A Consulting Group, and must be accompanied by an original bid bond or a certified check in the amount not less than $97,350.00 made payable to the Treasurer of Sanitary and Improvement District No. 599 as security that the bidder to whom the contract may be awarded will enter into a contract to build the improvements in accordance with this Notice to Contractor and will give a contract and maintenance bond in the amount of 100% of the total contract price, all as provided in the specifications. Bid bonds must be executed by a duly licensed corporate surety. Checks accompanying proposals not accepted shall be returned to the bidders. No bidder may withdraw his proposal for a period of sixty (60) days after date set for opening of bids. The work to be performed in this improvement shall consist of the installation of an 8" diameter PVC sanitary sewer pipe or other approved materials, together with manholes, structures, necessary appurtenances and other items of work incidental and necessary for a completed project; the installation of a storm sewer system of reinforced concrete pipe or other approved materials, together with manholes, structures, necessary appurtenances and other work that is incidental and necessary for a completed improvement; construction of a system of paved public roads and streets of varying widths with Portland cement concrete or other approved materials with a minimum varying thickness of nine inches together with integral curb and gutter, necessary removals, grading, drainage inlets, inlet piping, storm manholes, street signs and necessary appurtenances for a completed project. The successful bidder shall cooperate with the engineer in scheduling its work, and shall submit its schedule to the engineer for approval before commencing work.

17 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.