Access Denied!!!

It appears that you are using a private browser which blocks some scripts necessary for this page to function properly. As a result, you may experience limited functionality or the page may not work at all.

To access this page, please consider using a different browser or switch to the standard version of Firefox.

Thank you for your understanding.

Access Full Project

Publicly Funded

Privately Funded

Bidding Soon

Documents Available

Addenda Available

Post-Bid

Post-Bid

Saving Project...

Full details on over 250,000 Projects including 2000 updated daily available to subscribers

No Information to Display

August 26, 2024

No Information to Display

S Grand Ave & S 16th St

Paving, Site Work

No Information to Display

No Information to Display

Public - City

img_map_placeholder

S Grand Ave & S 16th St, Ames, IA

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe to View Full Documents

Multi-modal transportation refers to the various modes used by Ames residents to travel the transport system. The modes specifically addressed in this program include bicycling and automobiles. This program is aimed at improving the roadway to create a safer interaction between these modes using alternatives such as improved crossing visibility at intersections, bike detection, and on-street facilities (e.g. bike lanes, sharrows). Bike lanes consist of a portion of the roadway designated by striping, signing, and pavement markings for the preferential or exclusive use of bicyclists. Sharrows, also known as shared lane markings, are markings used in lanes shared by bicycles and motor vehicles when a travel lane is too narrow to provide a standard width bike lane. Bike detection improvements include retrofitting signalized intersections to radar detection to facilitate the movement of bicycles. These improvements retrofit the existing street to provide a useful and appropriate route of travel for these popular modes used by Ames residents. The proposed locations and treatments that are identified in the LongRange Transportation Plan (LRTP) will be noted by project numbers (e.g. ON15) from the LRTP. The 2023/24 scope includes CR 24, 16th and Grand). The project is included in the city's 2021/2022-2025/2026 Capital Improvement Program (CIP). As of October 25, 2021, further details regarding design and construction have not been identified.* *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available. As of July 31, 2023, no new information available

2 Record(s)

Subscribe to Get All Contact Details

Trades

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Subscribe to See All Trade Details

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.